Network & infrastructure optimization
Less congestion. Upgrades where they count
When one link fills up or goes down for maintenance, traffic moves and the bottleneck moves with it. Our algorithms show where to upgrade and how to reroute traffic around disruption.
We optimize your networks to make better use of available capacity.
Why it is hard
Fix one bottleneck, create another
A link is close to capacity, so you move traffic onto another route. Now that route is congested. In a power grid, a new connection changes flows elsewhere.
In a data center, moving a workload frees one accelerator but puts pressure on memory or the network somewhere else.
Every change has to be checked against the whole network, not one link at a time.
Eight sites connected by links. If a red site fails, the network splits in two.Teal dashed: links added by the optimized upgrade.
Single points of failure2
Links added0
Illustrative example using sample data.
What we optimize
Traffic, capacity and maintenance
Routing traffic
Send demand over paths that stay within capacity and meet latency and reliability targets. The shortest path isn't always best for the network. Explore the use case
Where to invest
Find the upgrade, new link or changed setup that does the most good for the budget, weighing cost, service and resilience. Explore the use case
Maintenance windows
Plan outages and works so essential services keep running and traffic is rerouted with the least disruption. Explore the use case
How to use 4colors
Relevant software
From the solver engine to ready-made planning apps, pick the level that suits your team.
Engine
4colors Optimizer
The solver technology behind our optimization products. A portfolio of search methods for hard planning decisions in routing, loading, scheduling and allocation, from Python or the API.
For developers
Optimizer for Scheduling
Advanced scheduling algorithms for the software you build to manage jobs, machines, people and resources. Due dates, setups and shared resources sit in one model.
Ready-made apps
Planning Applications
Takt, Roster and Stride bring optimization to production, shift and project planning. When a rush order lands or someone calls in sick, each re-plans within your rules.
Built with you
Custom Optimization
Original models and algorithms built around your own resources, rules and objectives. We work with your team from the first prototype to a planner that runs in your systems.
Prove it first
Optimization Pilot
A focused test on your own problem: a working prototype, compared fairly with your current plan. A short description is enough to start.
In practice
Related problems
Telecommunications routing covers path choices under capacity limits.
Network design covers where to build and invest.
Data centers and energy grids raise the same questions.
Proven results
Relevant work
Ongoing research
Large network algorithms
Scalable computational work on graphs with millions of nodes.
Reading
Network planning, explained
Explore more use cases- Use case
Finding useful structure in networks of decisions
The same drawing can describe three very different optimization problems.
Explore the use case - Insight
Energy grid expansion: the upgrade that changes its neighbors
Adding capacity to a network can change where the next constraint appears.
Read the insight - Use case
Keeping traffic moving while a network changes
A route that works for one flow may not work when everybody takes it.
Explore the use case - Insight
Frequency assignment: a coloring problem with real-world complications
The map-coloring idea becomes more interesting when the colors are radio channels.
Read the insight
Bring us your network problem
Discuss a network optimization problemExplore Custom Optimization