Scheduling & sequencing

Better schedules. More done on time

Rush orders, changeovers and one overloaded machine all compete for the same hours. Our algorithms search for the job order that gets more orders out on time, while respecting the constraints of your operation.

We find better schedules for your jobs, machines and resources.

Explore Optimizer for SchedulingDiscuss a scheduling problem

Why it is hard

Move one job, and others slip

A rush order lands. To fit it in, you move one job, and three others now miss their due dates. The machine you need is free, but only after a long changeover.

Juggling this by hand takes hours, and the first schedule that works is rarely the best one. We weigh due dates, changeovers, people and machines at once and propose a schedule you can run.

Eleven jobs on three machines. Switching between product families (A, B, C) costs a changeover.Hatched: changeover time. Red line: job A3 is due at 12h.

Changeovers8

Late jobs1

All done by15h

Illustrative example using sample data.

What we optimize

The right order, on the right machine, on time

  • Job order

    Put jobs in an order that cuts changeovers and meets due dates. A shorter queue on one machine doesn't help if the bottleneck still waits.

    Explore the use case

  • Machines and people

    Match each job to a machine that can run it and an operator who is qualified and on shift, so the bottleneck machine keeps running.

    Explore the use case

  • Rush orders and breakdowns

    When a rush order lands or a machine goes down, re-plan from the schedule you have. Compare overtime, an extra shift or a later due date before you commit.

    Read the insight

How to use 4colors

Relevant software

From the solver engine to ready-made planning apps, pick the level that suits your team.

In practice

Three kinds of schedule

Job-shop scheduling is about machines, job order and changeovers.

Employee rostering is about shifts, skills and fair weekends.

Observation scheduling is about short windows that close and don't come back.

Proven results

Relevant work

  • Best known

    RG300 project scheduling benchmark

    4colors Optimizer set 119 new best-known schedules in a public project-scheduling benchmark.

    Read the RG300 story

Start with the schedule that is hardest to make

Discuss your scheduling problemExplore Custom Optimization