Scheduling & sequencing
Better schedules. More done on time
Rush orders, changeovers and one overloaded machine all compete for the same hours. Our algorithms search for the job order that gets more orders out on time, while respecting the constraints of your operation.
We find better schedules for your jobs, machines and resources.
Explore Optimizer for SchedulingDiscuss a scheduling problem
Why it is hard
Move one job, and others slip
A rush order lands. To fit it in, you move one job, and three others now miss their due dates. The machine you need is free, but only after a long changeover.
Juggling this by hand takes hours, and the first schedule that works is rarely the best one. We weigh due dates, changeovers, people and machines at once and propose a schedule you can run.
Eleven jobs on three machines. Switching between product families (A, B, C) costs a changeover.Hatched: changeover time. Red line: job A3 is due at 12h.
Changeovers8
Late jobs1
All done by15h
Illustrative example using sample data.
What we optimize
The right order, on the right machine, on time
Job order
Put jobs in an order that cuts changeovers and meets due dates. A shorter queue on one machine doesn't help if the bottleneck still waits.
Machines and people
Match each job to a machine that can run it and an operator who is qualified and on shift, so the bottleneck machine keeps running.
Rush orders and breakdowns
When a rush order lands or a machine goes down, re-plan from the schedule you have. Compare overtime, an extra shift or a later due date before you commit.
How to use 4colors
Relevant software
From the solver engine to ready-made planning apps, pick the level that suits your team.
Engine
4colors Optimizer
The solver technology behind our optimization products. A portfolio of search methods for hard planning decisions in routing, loading, scheduling and allocation, from Python or the API.
For developers
Optimizer for Scheduling
Advanced scheduling algorithms for the software you build to manage jobs, machines, people and resources. Due dates, setups and shared resources sit in one model.
Ready-made apps
Planning Applications
Takt, Roster and Stride bring optimization to production, shift and project planning. When a rush order lands or someone calls in sick, each re-plans within your rules.
Built with you
Custom Optimization
Original models and algorithms built around your own resources, rules and objectives. We work with your team from the first prototype to a planner that runs in your systems.
Prove it first
Optimization Pilot
A focused test on your own problem: a working prototype, compared fairly with your current plan. A short description is enough to start.
In practice
Three kinds of schedule
Job-shop scheduling is about machines, job order and changeovers.
Employee rostering is about shifts, skills and fair weekends.
Observation scheduling is about short windows that close and don't come back.
Proven results
Relevant work
Best known
RG300 project scheduling benchmark
4colors Optimizer set 119 new best-known schedules in a public project-scheduling benchmark.
Reading
Scheduling, explained
Explore more use cases- Insight
A good production schedule is more than a Gantt chart
The bars show when work happens. The difficult questions are why it happens in that order, and what changing the order would cost.
Read the insight - Guide
Modeling changeovers in production scheduling
The order of jobs can determine how long a factory spends changing products rather than making them.
Read the guide - Insight
Feasible, optimal and good enough: what does a solver result mean?
A feasible schedule obeys the rules; whether it is the schedule people want to use is another question.
Read the insight - Insight
Why the best schedule may not be the most useful
A schedule can improve on paper and still disrupt the operation it was meant to help.
Read the insight