Manufacturing optimization
Better production plans. More orders out on time
Rush orders, changeovers and bottleneck machines make every week a juggle. Our algorithms find production schedules that get more orders out on time with the machines and people you have.
We help you get more from your production capacity.
Why it is hard
A busy machine doesn't always mean an efficient factory
Your bottleneck machine runs flat out, yet work-in-progress piles up behind it, a rush order slips and packing waits for the wrong parts. Keeping one machine busy can leave the whole plant running late.
A good schedule looks at the whole floor: orders, due dates, materials, shifts and changeovers together. That is how you get more out of the machines you already have.
Six orders through cutting, assembly and packing, each with a due time.Ticks: when each order is due. Red: the order ships late.
Orders late5
Last order ships after19 h
Illustrative example using sample data.
What we optimize
Where the hours go on the shop floor
Scheduling and sequencing
Decide which job runs on which machine, and in what order. Group similar jobs to cut changeover time, respect shifts and machine skills, and meet due dates. You get a schedule the floor can actually run.
Capacity and bottlenecks
When a key machine goes down or demand shifts to another product, see what happens to every order. Compare your options before you pay for overtime, extra shifts or new equipment.
Production and delivery
The cheapest production order can fill the warehouse or send out half-empty trucks. Plan production and shipping together and the whole chain can cost less.
How to use 4colors
Software for manufacturing teams
From the solver engine to ready-made planning apps, pick the level that suits your team.
Engine
4colors Optimizer
The solver technology behind our optimization products. A portfolio of search methods for hard planning decisions in routing, loading, scheduling and allocation, from Python or the API.
For developers
Optimizer for Scheduling
Advanced scheduling algorithms for the software you build to manage jobs, machines, people and resources. Due dates, setups and shared resources sit in one model.
Ready-made apps
Planning Applications
Takt, Roster and Stride bring optimization to production, shift and project planning. When a rush order lands or someone calls in sick, each re-plans within your rules.
Built with you
Custom Optimization
Original models and algorithms built around your own resources, rules and objectives. We work with your team from the first prototype to a planner that runs in your systems.
Prove it first
Optimization Pilot
A focused test on your own problem: a working prototype, compared fairly with your current plan. A short description is enough to start.
Proven results
Relevant work
See the Airbus x BMW competition summary| Winner
Airbus x BMW Quantum Computing Challenge
Our Quantum-Powered Logistics approach optimized interconnected production and transportation decisions.
Airbus
Quantum approaches for aerospace planning
Integrated optimization taken from a competition challenge toward industrial planning scenarios.
Best known
RG300 project scheduling benchmark
4colors Optimizer set 119 new best-known schedules in a public project-scheduling benchmark.
Reading
More on production scheduling
Explore more use cases- Industry article
Manufacturing is a network of decisions
The busiest machine is not necessarily the machine helping the factory most.
Read more - Use case
Why scheduling a factory is harder than lining up the jobs
A factory contains several clocks, and they do not always agree. A machine becomes free just as the necessary operator goes off shift.
Explore the use case - Insight
Batch manufacturing: why the order of production matters
Two schedules can produce the same products and consume very different amounts of time.
Read the insight - Insight
A good production schedule is more than a Gantt chart
The bars show when work happens. The difficult questions are why it happens in that order, and what changing the order would cost.
Read the insight - Guide
Modeling changeovers in production scheduling
The order of jobs can determine how long a factory spends changing products rather than making them.
Read the guide - Insight
The value of asking what if
One useful schedule is an answer. Several carefully chosen alternatives can be a way to understand the business.
Read the insight
What would a better schedule free up on your floor?
Discuss your manufacturing challengeExplore Custom Optimization