Build workable plans for people, production, projects and computing resources.
Start here
Insight
A good production schedule is more than a Gantt chart
The bars show when work happens. The difficult questions are why it happens in that order, and what changing the order would cost.
Use case
Why scheduling a factory is harder than lining up the jobs
A factory contains several clocks, and they do not always agree. A machine becomes free just as the necessary operator goes off shift.
Insight
The schedule broke. Now what?
The fastest way to recover may begin with the schedule you already have.
Use case
The mathematics of a fair and workable roster
Two schedules can cover every shift and still create very different weeks for the people working them.
Production
Manufacturing is a network of decisions
The busiest machine is not necessarily the machine helping the factory most.
Modeling changeovers in production scheduling
The order of jobs can determine how long a factory spends changing products rather than making them.
Batch manufacturing: why the order of production matters
Two schedules can produce the same products and consume very different amounts of time.
Supply chain optimization: a practical guide
Learn how to improve inventory, network design, production planning, transport and loading, with practical examples, metrics and a starting plan.
Workforce
Build a small workforce roster model
A small staffing example reveals the difference between assigning shifts and modeling a fair schedule.
Hard and soft constraints: where a schedule can bend
The distinction between a rule and a preference tells an optimizer what kind of compromise is possible.
Computing
Scheduling the work behind an AI response
The user asks one question. The server is deciding what to do with thousands of others.
Why data center scheduling is an optimization problem
A computing cluster is full of local choices whose effects are felt elsewhere in the queue.
Computing infrastructure: scheduling the invisible work
The quality of a digital service can depend on decisions made before the application responds.
Transport and loading
Transportation and logistics: the journey is only part of the problem
The shortest route can be the wrong route, and the fullest truck can be the wrong load.
Everything fits on paper. Will it fit in the truck?
A loading plan is easy to judge badly. Add up the volume of the items, compare it with the volume of the vehicle and declare that there is enough room.
The shortest route is not always the best route
The map tells us how to get somewhere. The delivery plan has to decide how the whole day will work.
Aerospace, space and energy
Aerospace and aviation: when resources have to meet at the right moment
An available aircraft, a qualified person and a piece of equipment are three different things.
Deciding what to observe when you cannot observe everything
Sometimes the critical resource is a ten-minute opportunity, not the instrument itself.
Space and defense: planning with irreplaceable windows
Some opportunities cannot simply be moved to tomorrow.
Satellite mission planning: every opportunity has a cost
A spacecraft can do many useful things, but not necessarily at the same time.
Planning energy when tomorrow changes today's best decision
Storage creates a simple but powerful connection between hours.
Energy grid expansion: the upgrade that changes its neighbors
Adding capacity to a network can change where the next constraint appears.
More in this collection
The project plan that cannot happen
Even a flawless dependency chart can promise work that the team has no capacity to perform.
Why the best schedule may not be the most useful
A schedule can improve on paper and still disrupt the operation it was meant to help.
Series
Reading paths
Discover reading pathsPlans under pressure
Consider the difference between a mathematically attractive schedule and a workable decision under changing conditions.
Optimizer for Scheduling
What a scheduling model has to represent, how to read its result, and what public benchmark records show.
The moving factory constraint
Why a production line's real limit moves with the order of jobs, setups and urgent work.
Looking for something specific?
Browse the complete collection of articles, explainers, guides, tutorials, use cases and case studies. Search by subject, application or the kind of knowledge you need.